Agenda Item Name:
Title
Temporary Construction Easement for a Florida Department of Transportation Interchange Project on I-75 (SR 93) at SR 121
End
Presenter:
Ramon Gavarrete, P.E. 352 548-1214; Charles Brecken 352 548-1224
Description:
Temporary construction easement at I-75 (SR 93) at SR 121 granted to the Florida Department of Transportation for the purpose of milling, resurfacing, signing and adding pavement markings to tie in the property driveways and walkways with the construction to be undertaken by the Florida Department of Transportation as part of the I-75 Interchange Project.
Recommended Action:
Recommended Action
Request that the Board adopt the resolution (Attachment 4) authorizing the granting of the temporary construction easement and execute the easement.
End
Prior Board Motions:
NA
Fiscal Consideration:
Fiscal Consideration
There could be recording fees associated with this easement which are accounted for and budgeted in account 149.79.7910.541.49.00.
End
Strategic Guide:
N/A
Background:
The Florida Department of Transportation filed an application for a temporary construction easement for a period of 42 months over a portion of SR 121 (SW 34th Street, formerly Rock Point Road (Attachment 2).
The purpose of the temporary construction easement is allow FDOT to make improvements to SR 121 (SW 34th Street) as part of the 1-75 Interchange Project