Legislation Details

File #: 22-0249    Version: 1
Type: Consent Item Status: Agenda Ready
File created: 3/8/2022 In control: Board of County Commissioners
On agenda: 4/12/2022 Final action:
Title: Wetland mitigation and monitoring plan for the Deerhaven Natural Gas Pipeline project
Attachments: 1. FGT Deerhaven Transmission_BoCC Memo_4-1-22_DRAFT - ADA.pdf, 2. FGT-Deerhaven Pipeline_BoCC_Final - 4-4-22.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Agenda Item Name:
Title
Wetland mitigation and monitoring plan for the Deerhaven Natural Gas Pipeline project
End

Presenter:
Stephen Hofstetter, 352-264-6811, Mark Brown, 352-264-6815

Description:
Wetland mitigation and monitoring plan for the construction of a 12-inch natural gas pipeline within an existing pipeline easement in unincorporated Alachua County to service the Deerhaven GRU facilities.

Recommended Action:
Recommended Action
Approve the Mitigation and Monitoring Plan for the Deerhaven Natural Gas Pipeline project including $48,319 fee-in-lieu mitigation to Alachua County for permanent wetland conversion and wetland buffer impacts.
End

Prior Board Motions:
No prior action

Fiscal Consideration:
Fiscal Consideration
Revenues of $48,319 are expected into fund 261; this is the fund where timber sales revenue is budgeted. These funds will be incorporated into the FY23 budget.
End

Strategic Guide:
Environment

Background:
The Florida Gas Transmission Company LLC (FGT) is constructing a 12-inch natural gas pipeline for a distance of 5.63 miles within its existing Inglis lateral pipeline easement located in northern Alachua County to serve GRU.

The new pipeline is proposed to be installed 15 ft. east of the existing line, so the construction will require extending 25 ft. of additional clearance, which in some areas include forested wetland areas. As a result, 2.9 acres of forested wetland will be cleared for construction; the 2.1 acres located furthest from the pipeline will be allowed to regenerate tree canopy and 0.8 acre closer to the pipeline will be converted and perpetually maintained as non-forested wetland habitat.

The proposed pipeline project has been reviewed by several federal and state regulatory agencies including the Federal Energy Regulatory Commission (FERC), U.S. Army Corps of Engineers (USACOE), U.S. Fish & Wildlife (USFWS), four divisions of the Florida Dept. of Environmental Protection (FDEP), Florida Dept. ...

Click here for full text