Title: Award: Contract #11787 and BID 21-964 Sweetwater LID Parking Area Project - Project #8205503 to BBI Construction Management, Inc. in the amount of $583,201.82 for the Environmental Protection Department
Attachments: 1. Agreement No. 11787 with BBI Construction Mgmt - Bid No. 21-964 - Project No. 8205503 – Sweetwater LID Parking Area.ATF by CAO(redacted).pdf, 2. BID 21-964 Sweetwater LID Parking Area Project - Project No. 8205503.pdf, 3. PAD 21-964 Sweetwater LID Parking Area Project - Project No. 8205503 Signed.pdf, 4. SIS 21-964 Sweetwater LID Parking Area Project - Project No. 8205503.pdf, 5. ADM 1 21-964 Sweetwater LID Parking Area Project – Project #8205503.pdf, 6. ADM 2 21-964 Sweetwater LID Parking Area Project – Project #8205503.pdf, 7. ADM 2 Geotechnical Report 21-964 Sweetwater LID Parking Area Project – Project #8205503.pdf, 8. ADM 2 REVISED PLANS 21-964 Sweetwater LID Parking Area Project - Project No. 8205503.pdf, 9. ADM 3 21-964 Sweetwater LID Parking Area Project – Project #8205503.pdf, 10. BT 21-964 Sweetwater LID Parking Area Project - Project No. 8205503.pdf, 11. DS Info 21-964 Sweetwater LID Parking Area.pdf, 12. Supplier - Charles Perry Partners, Inc.pdf, 13. Supplier - BBI Construction Management Inc..PDF, 14. Non-Responsive Supplier - Oelrich Construction Inc.PDF
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Agenda Item Name:

Title

Award: Contract #11787 and BID 21-964 Sweetwater LID Parking Area Project - Project #8205503 to BBI Construction Management, Inc. in the amount of $583,201.82 for the Environmental Protection Department

End

 

Presenter:

Larry Sapp 352.374.5202, Stephen Hofstetter 352.264.6800

 

Description:

Solicitation Award and Contract #11787 for BID 21-964 Sweetwater LID Parking Area Project - Project #8205503.

 

Recommended Action:

Recommended Action

Approve the Solicitation Award and Contract #11787 for BID 21-964 Sweetwater LID Parking Area Project - Project #8205503 to BBI Construction Management, Inc. in the amount of $583,201.82 as the lowest responsible and responsive bidder meeting specifications, and authorize the Chair to execute the contract on behalf of the County

End

 

Prior Board Motions:

9/8/20 the BoCC approved this project on Water Quality Project list as part of the adoption of the final resolution for the Stormwater Assessment

 

2/9/21 the BoCC approved a budget amendment adding $20,000 to this project for Construction Engineering and Oversight services.

 

8/24/21, File ID 21-0777 is on consent.  Sweetwater Trailhead LID Parking Area Project- Florida Department of Environmental Protection contract NS078: approve and authorize the Chair to sign inter-local agreement #11904 with the City of Gainesville, adopt the resolution to recognize the unanticipated revenue, approve the budget amendment, and approve an inter-fund loan of $204,745 from fund 146.

 

Fiscal Consideration:

Fiscal Consideration

The total cost of this project $583,201.82; agenda item 21-0777 moves the grant revenue and City of Gainesville revenue into Fund 260. The balance of the project cost is budgeted in fund 146 and allocated for this project. The total dollar amount is a combination of Stormwater Assessment Funds and Grant revenue.

End

 

Background:

This project will reconstruct the entrance to the Sweetwater Preserve trailhead off of Waldo Road. Runoff from the entrance road and the intersection of SW 16th ST and Waldo Road runs onto the site and is discharged into Sweetwater Branch without any water quality treatment. The runoff has also caused erosion where it is discharged in the Preserve that is causing the existing storm sewer to fail. The reconstruction will also provide better parking for the Preserve. The new stormwater system will provide water quality treatment using Low Impact Design (LID) stormwater management and stop the erosion problem. The LID features will consist of two biofiltration areas and pervious pavers for the parking stalls.

 

The requested action is just a reallocation of unencumbered stormwater funds to the project.

 

The County has also received a grant from the Florida Department of Environmental Protection that will reimburse $186,500 of construction costs. The City of Gainesville, through Wild Spaces Public Places, has offered an inter-local agreement to contribute $18,244.08 to cover the costs of widening of the existing sidewalk and the speed table striped as a crosswalk. These will be used as part of a future multi-use trail planned by Wild Spaces Public Places. A total of $204,744.08 will be reimbursed to the County that will be used for other water quality projects.