Charles Perry Partners Inc Change Order #2 with Deadline Extension for the Civil Courthouse Roof Replacement and Budget Amendment 2023-1598 to fund it
body
Presenter:
Dan Whitcraft - Facilities Director, 352-374-5289
Description:
This change order is to address work outside the original scope. The budget amendment is to address the funding shortfall.
body
Recommended Action:
Approve the change order and budget amendment
body
Prior Board Motions:
recommended action
1/11/2022 - Board approved and executed the Agreement for Construction Management Services for the roof replacement and solar installation at the Civil Courthouse
1/25/2022 - Board approved Budget Amendment 2022-1036, which in part added funding to the Civil Courthouse Roof project
body
Fiscal Consideration:
fiscal consideration
Funds are available in 001.19.1919.712.46.00, with about $30,000 already in the Civil Roof project and $180,000 coming from the Civil Envelope project. No new funds are being requested.
body
Strategic Guide:
strategic guide
Infrastructure
body
Background:
During the replacement of the Civil Courthouse Roof, it has become apparent several items that should have been in the original scope of work were left out. This includes the replacement of the cooling tower stands. This is the opportune time to address as the base of the stands are embedded in the roof. These stands are severely compromised and weight bearing and will be replaced with non-corrosive material to avoid future issues. Two smaller roof areas over existing stairwells will be re-coated in lieu of a complete reroof. This comes with a 10-year warranty. During the removal of the existing roof, it was determined several areas did not have light weight concrete as was designed during the original construction of the building. Several disconnects are in need of replacement due to exterior exposure and will be replaced with non-corrosive materials. Penetration for...