File #: 20-0784    Version: 1
Type: Consent Item Status: Agenda Ready
File created: 9/4/2020 In control: Board of County Commissioners
On agenda: 9/22/2020 Final action:
Title: Amendment #4 to the Agreement for Architectural and Engineering Services between Alachua County and Brame Heck Architects, Inc.; Paul Stresing Associates, Inc. and Walker Architects, Inc. for the period of October 1, 2020 through September 30, 2021
Attachments: 1. 20-0784 #10215 Brame Heck Architects, Inc. 4th Amendment - ATF by CAO.pdf, 2. 20-0784 #10215 Brame Heck Architects, Inc. 3rd Amendment .pdf, 3. 20-0784 #10215 Brame Heck Architects, Inc. 2nd Amendment.pdf, 4. 20-0784 #10215 Brame Heck Architects, Inc. 1st Amendment.pdf, 5. 20-0784 #10215 Agreement with for Brame Heck Architectural Architectural and Engineering Services (2).pdf, 6. #10216 Walker Architects, Inc. 3rd Amendment .pdf, 7. #10216 Walker Architects, Inc. 2nd Amendment.pdf, 8. #10216 Walker Architects, Inc. 1st Amendment.pdf, 9. 20-0784 #10216 Agreement with Walker Architectural for Architectural and Engineering Services.pdf, 10. #10217 Paul Stresing Associates Inc. 4th Amendment-ATF by CAO.pdf, 11. #10217 Paul Stresing Associates, Inc. 3rd Amendment.pdf, 12. #10217 Paul Stresing Associates, Inc. 2nd Amendment.pdf, 13. #10217 Paul Stresing Associates, Inc. 1st Amendment.pdf, 14. 20-0784 #10217 Paul Stresing Associates, Inc. Agreement.pdf, 15. 20-0784 #10216 Agreement with Walker Architectural for Architectural and Engineering Services.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Agenda Item Name:

Title

Amendment #4 to the Agreement for Architectural and Engineering Services between

Alachua County and Brame Heck Architects, Inc.; Paul Stresing Associates, Inc. and

Walker Architects, Inc. for the period of October 1, 2020 through September 30, 2021

End

 

Presenter:

Charlie R. Jackson 352.374.5289

 

Description:

Amendments #4 to the Agreements for Architectural and Engineering Services

between Alachua County and Brame Heck Architects, Inc.; Paul Stresing Associates,

Inc. and Walker Architects, Inc. for the period of October 1, 2020 through September

30, 2021.

 

Recommended Action:

Recommended Action

Approve the Fourth Amendments to our current A&E Agreements extending the term

through September 30th

, 2021

End

 

Prior Board Motions:

On January 10, 2017, the Board approved ttie Finance Report and authorized staff to

negotiate agreements with the top ranked firms until three contracts were awarded.

On February 28, 2017 the Board approved the Continuing Services Agreement for

Annual Architectural and Engineering Services through September 30, 2017.

On September 14, 2017, the Board approved the First Amendments to these

agreements extending the term through September 30, 2018.

On September 25, 2018, The Board approved the Second Amendments to these

agreements, extending the term through September 30, 2019.

On September 10, 2018, The Board approved the Second Amendments to these

agreements, extending the term through September 30, 2020.

 

Fiscal Consideration:

Fiscal Consideration

Facilities Preservation - General Fund 001.19.1919

Per Task Assignment-various project accounts

Not to exceed $120,000 annually for each vendor.

End

 

Background:

The BoCC has contracted with various Architectural and Engineering firms over the

years for architectural and engineering services. These firms are able to offer

architectural design, engineering and contract administration services. These contracts

generally fall under continuing services on an annual basis, with the County having the

option of renewing the contract for subsequent annual terms. The size, scope and

complexity of specific projects under the A/E Annual Services will be determined based upon specific requirements of the project as determined by the Facilities Director. Task assignments are issued for services related to the specific projects as needed by the Facilities Management Department. The amount of each task assignment will be controlled by the projects types and budgets.