Agenda Item Name:
Title
Right-of-way Wildflower Program
End
Presenter:
Ramon Gavarrete P. E. 352.548.1214
Description:
Presentation of existing and proposed locations to establish and preserve wildflowers within the County maintained right-of-way.
(20 minutes)
Recommended Action:
Recommended Action
Prep and hydro seed select portions of all 35 locations 5 - 10,000 ft? depending on total size of location, ? 10 acres spread across all locations ($40,000) then manage with appropriate cultural practices; Manage existing and proposed areas with signage and cultural practices, with reseeding and expansion of areas as needed; limited mowing during period of October through June as-needed to address safety (e.g., line of sight); The 1st area to be seeded with wildflowers will be SW 91st Street, a County Scenic Road, and SW 8th Avenue
End
Prior Board Motions:
Resolution 2012-24 - Supporting the Conservation of Roadside Native Wildflowers on State and County Roadways
Fiscal Consideration:
Fiscal Consideration
There are 35 proposed locations totaling approximately 280 acres and 19 existing locations totaling approximately 120 acres. To establish wildflowers within the proposed location at 10 acres per year costing $40,000 annually. Program would be funded in account 149.79.7900.541.46.00.
End
Background:
In preparation of Gator Nationals the mowing season unofficially began on March 5, 2019 when staff mowed County Road 225. Officially county wide mowing began March 25, 2019. The mowing Equipment Operators were instructed to mow first pass, from the edge of the pavement one mower deck in width, approximately 15 feet. They were not to mow the entirety of the right of way, when larger concentrations of wildflowers were present. Operators were instructed to disengage the blades and lift the mowing deck or contour mow around. Thus, leaving the wildflowers to produce seed. Overall, this has been achieved, but not without elements of human error. The opera...