File #: 22-0634    Version: 1
Type: Consent Item Status: Agenda Ready
File created: 7/21/2022 In control: Board of County Commissioners
On agenda: 8/9/2022 Final action:
Title: Second Amendment to Agreements #11649 and #11797 for Bid 20-65 Annual Roadway Construction Material Hauling Services, to Touchdown Logistics, LLC and Coleman Construction, Inc., in a NTE (Not to Exceed) $500,000.00, for Public Works.
Attachments: 1. #11797 2nd Amendment with Coleman 6.23.22_dj.docx vendor signed-scan.pdf, 2. #11649 2nd Amendment with Touchdown 6.23.22_dj vendor signed-scan.pdf, 3. #11797 1st Amendment with Coleman-scan.pdf, 4. #11649 1st Amendment with Touchdown-scan.pdf, 5. CNT #11797 Coleman fully executed_scan.pdf, 6. CNT #11649 Touchdown Logistics fully executed-scan.pdf, 7. Item Summary Report
Related files: 20-0350, 21-0707
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Agenda Item Name:
Title
Second Amendment to Agreements #11649 and #11797 for Bid 20-65 Annual Roadway Construction Material Hauling Services, to Touchdown Logistics, LLC and Coleman Construction, Inc., in a NTE (Not to Exceed) $500,000.00, for Public Works.
End

Presenter:
Ramon D, Gavarrete, 352.548.1214/Larry Sapp, 352.374.5202

Description:
Second Amendment to Agreements #11649 and #11797 for Bid 20-65 Annual Roadway Construction Material Hauling Services, to Touchdown Logistics, LLC and Coleman Construction, Inc.

Recommended Action:
Recommended Action
Approve Second Amendments to #11649 and #11797, for Bid 20-65 Annual Roadway Construction Material Hauling Services with Touchdown Logistics, LLC and Coleman Construction, Inc., respectively, and authorize the Chair to execute same on behalf of the County.
End

Prior Board Motions:
8/10/21 - The Board approved renewing these contracts for BID 20-65 to Touchdown Logistics, LLC and Coleman Construction, Inc.

4/20/20 - The Board approved awarding these contracts for BID 20-65 to Touchdown Logistics, LLC and Coleman Construction, Inc.

Fiscal Consideration:
Fiscal Consideration
This is Rate Based with various accounts, various funds and various projects. The projects will have funds designated for hauling within their project budgets. There is $30,000 budgeted in account 149.79.7900.541.53.00 for this contract.
End

Strategic Guide:
Strategic Guide
Infrastructure
End

Background:
This agreement will be used for roadway construction material hauling as needed; the County does not have trucks and personnel to handle all hauling needs. The agreement is utilized to haul limerock and mill for unimproved roads and for special projects. The original term of the agreement was through September 30, 2021.

This will be the second and final one-year renewal. Contracts will be used on an as-needed basis and hauling estimates are included in the department annual operating budgets and capital proj...

Click here for full text